Supervision
Supervision and testing for
loop cutting on trafficked and new Motorway, including
electrical testing and 1218certification.
Witnessing/inspection of all aspects of the ducting,
cabling, cabinets, paving, retaining walls and other civils
elements of motorway communications works.
 |
Recently been involved in
the overseeing of drainage
works for the HA. This
involved giving advice to
the Contractor, keeping up
to date drawings and
producing reports for the
Client.
|
 |
|
|
I am currently overseeing
the construction of a new
Motorway Service Area on
behalf of the HA and
includes the widening of an
existing junction roundabout
and construction of the
access road (on embankment)
to the MSA
Existing CAD
Engineering Drawing's Modified.
EXAMPLES OF MOTORWAY
EXPERIENCE
A1 Darrington to Dishforth DBFO: September 2003 to
April 2006
Principal supervisor of
loop cutting for MIDAS and speed monitoring loops. I
also undertook the electrical tests for the 1218
certificates before and after loop cutting. There were
approximately 600 sites, none of which needed to be recut
due to the wrong number of turns or failed performance.
Installation of
seimens outstations and Transponders (both Siemens and Golden River)
and commissioning and certification.
Installation of NMCS2
Signal Transponders (Peek), NMCS2 Telephone Responders
(Siemens).
Attended Factory Acceptance
Tests for signals (MS3 and MS), MIDAS equipment and
Telephone equipment.
Assisted with the
commissioning of MIDAS and Telephone system from the COBS.
Level 2 electrical testing
to BS7671 and MCG1099, and Level 2 data testing to MCG1099.
End man for level 3
longitudinal tests to MCG1099 of 40 pair copper cables.
A1-M1 Link (Connect): July to September 2006
Undertook Periodic
Inspections of 47 Electrical Installations as part of a two
man team.
M1 Scratchwood MIDAS: March to April 2006
Supervised the installation
of approximately 50 Siemens MIDAS outstations and personally
undertook all commissioning and certification.
M1 Brent Cross: October 2006
End man for level 3
longitudinal tests to MCG1099 of 40 pair copper cables.
M1 J36-39 February to March 2007
Principal supervisor for
the installation & testing of 104 Midas loop sites &
armoured Feed cables.
M6 – M56—M11—A1M Stevenage: May 2007: to July 2007
Upgrade of transmission
stations
Fluor/Genysys.
Measure up for cables, Site inspections, Labour returns, as
build's, and red line diagrams of electrical circuits
Submitted to designers. Contracted to
Pinehall Communications.
Fairburn to River Aire Outfall Drainage
Scheme.
Nov 2007 to April 2008
1.5 km Upgrade to the Fairburn Drainage
System mostly through a totally residential area.
The works involved the checking, reporting
and recording of all works for the Client. The 600mm
drainage pipes were required to be installed to strict line
and level parameters, as were the numerous manholes. A river
outfall with associated retaining walls had to be
constructed and there were onerous reinstatement clauses
placed on the Contractor.
|
Wetherby Motorway Service Area.
March 2008 to
August 2008
|
|
Highways Agency’s representative.
MOTO---URS
---North
Midland Construction
project
I have been engaged
to provide an overseeing role to all the civils aspects of
the works that are due to be completed in July 2008. These
involve the re-locating of a motorway balancing pond and
subsequent backfilling of the original site to allow the new
access road embankment to be constructed through the area.
There are complicated Statutory Undertakers’ diversions as
well as new works required. There are strict environmental
guidelines laid down and part of this required the
construction of a new “badger run” under the new access
road. Quite detailed traffic management measures are being
utilised because of the need to maintain access around the
whole of the motorway junction at all times
|
Excavating New Balancing
pond
 |
|
New access road
 |
Finishing Off
the pond
 |
|
Modification
to existing Roundabout
 |
 |
Belfast Westlink
Phase1, 3a, 3b + 4
August 2008--October -09
M6 Midas upgrade J10a to J13--Contracted to
Amey Mouchel-November 2009>
Current
Engaged in Stage 1& 2 Power cable
testing.
Supervising the installation of
the screw pilings for the MS3 Signals and Full span
Motorway Gantries.
Supervising Installation and
Commissioning of the MIDAS
equipment,/ Fault finding and
Remedial work.
|
M.I.D.A.S
Motorway
Incident
Detection
Automatic
Signalling
|
Technician tuning the
MIDAS equipment for
correct traffic
detection |
|
 |
 |