A1 Darrington to Dishforth DBFO: September 2003 to
April 2006
Principal supervisor of
loop cutting for
MIDAS and speed monitoring loops. I
also undertook the electrical tests for the 1218
certificates before and after loop cutting. There were
approximately 600 sites, none of which needed to be recut
due to the wrong number of turns or failed performance.
Installation of
seimens outstations and Transponders (both Siemens and Golden River)
and commissioning and certification.
Installation of NMCS2
Signal Transponders (Peek), NMCS2 Telephone Responders
(Siemens).
Attended Factory Acceptance
Tests for signals (MS3 and MS), MIDAS equipment and
Telephone equipment.
Commissioned
MIDAS and Telephone system from the COBS.
Level 2 electrical testing
to BS7671 and MCG1099, and Level 2 data testing to MCG1099.